BROADBAND REPORT CAPITAL COSTS INCORRECT

Dennis NugentSkycrest Drive

In print on page 13A

There are many issues with the broadband report. This letter addresses the capital cost section. Issues with the capital cost section calculations include but are not limited to: incorrect quantity of buildings; incorrect method of installing fiber to the buildings; incorrect method of connecting the fiber to the buildings; over estimating the cost per mile to install the fiber; not including the fact that Rossmoor already owns the wiring within multiple buildings; not using generally accepted accounting practices for return on investment and CapEx calculations.

We are talking about over $1 million per year in savings, and tens of millions in real estate values if done right. We don’t know the GRF staff productivity improvements and potential savings because it was not included in the Phase 1 report.

I again encourage the GRF Board to stop with Phase 2 of the broadband study. I encourage the Board to immediately form an IT task force to get this right and start over with Phase 1.