NOW IS THE TIME FOR ROSSMOOR TO LOOK INTO SOLAR
Dennis NugentSkycrest Drive
In print on page 18A
Although it was great to see another Rossmoor News article about the benefits of improving the community with solar power, it was distressing to observe the errors regarding payback. Simple payback for commercial PV solar has not been in the 15-to-20- year range for over a decade.
Over 4,300 MW of solar power will be installed this year – twice the capacity of Diablo Canyon. No company would purchase that much unless there was a financial benefit.
A 1 MW system for Rossmoor would cost under $3 million and have roughly a six-year simple payback. The system can be located on the west side of the valley near the PG&E substation.
Due to the approaching installation deadline, and the inability of Rossmoor to qualify for tax credits, one approach is to have an energy services company install the solar system. Doing so has several advantages, including minimal up-front costs, ability to fast-track the project and reduced maintenance costs. Also, there would be no need to design and specify the system.
With electric rates forecasted to skyrocket, now is the time for Rossmoor to quickly analyze these solar options.