Rossmoor News, July 23, 2014

Public invited to comment on development in Walnut Creek

Western edge of downtown

In print on page 12A

Map of the West Downtown Specific Plan area in Walnut Creek, with the plan boundary outlined in black between Interstate 680 and Highway 24.
The area that is included in the West Downtown Specific Plan

The city of Walnut Creek has begun the process of planning for further development of the area west of central downtown, known as the West Downtown Specific Plan (WDSP). As part of this process, an environmental impact report (EIR) will be prepared. Walnut Creek residents are invited to submit their comments as to the scope and content of that EIR no later than Monday, July 28.

Downtown Walnut Creek is known for its dining and shopping opportunities and is also home to a BART station that provides a connection to larger cities within the region. Significant improvements to the BART station are on the horizon, following up on much private investment that has been made in the downtown area in recent years. As a result, the city has begun a planning process to better integrate and connect the BART station and downtown.

The WDSP will kick off this process. This will be a community-driven plan aimed at improving the area between the BART station and downtown, as well as major corridors such as Mount Diablo Boulevard, North California Boulevard, Olympic Boulevard and Ygnacio Valley Road. The WDSP will focus on creating better connections for vehicles, bicyclists and pedestrians, and will also explore what development types are appropriate for the area over the next 20 to 25 years.

The WDSP is grant-funded through the Metropolitan Transportation Commission’s Station Area Planning program. The city of Walnut Creek will provide additional funding for the effort.

The area

The WDSP area encompasses approximately 172 acres and is generally bounded on the west by Interstate 680, the north by the BART station and Pringle Avenue, the east by North California Boulevard and the south by Olympic Boulevard.

The area is crossed from east to west by Ygnacio Valley Road, Trinity Avenue, Almond Avenue, and Mount Diablo Boulevard. It is crossed from north to south by Oakland Avenue, near the western WDSP area boundary.

The plan area encompasses the Almond-Shuey neighborhood, a single-family neighborhood in the middle of the plan area and located between Trinity Avenue and Mount Diablo Boulevard. The Walnut Creek BART station and parking area is located in the northern portion of the plan area.

The guiding principles

A Citizens Advisory Committee developed 10 guiding principles for the project. They include:

• Recognize and promote west downtown as a set of sub-districts.

• Extend the downtown’s character along Mount Diablo Boulevard.

• “Knit” west downtown and downtown along California Boulevard.

• Promote transit-oriented development near the BART station.

• Provide modern employment centers near the freeway.

• Preserve the Almond-Shuey neighborhood.

• Promote infill housing and community uses along Lacassie and Trinity avenues.

• Improve the existing pedestrian and bicycle circulation network.

• Expand the existing circulation network with connections through new development and along other rights of way.

• Create a network of small open spaces.

In support of those guiding principles, the plan calls for a variety of land uses. A district-based approach will be used to tailor standards and honor unique attributes and objectives for different areas.

Seven districts have been named, each with its own concept. They are:

• Transit Village District – based on mixed-use, transit orientation, gateway to downtown

• Lacassie-Trinity District – south of the BART station and north of Almond-Shuey, envisioned as an urban, transit-oriented neighborhood with multiple-story residential buildings and ground-floor retail

• Almond-Shuey District – primarily residential

• Oakland Boulevard corridor – corporate offices and multi-family residential with a bike-able corridor

• Mount Diablo District – extension of downtown with multi-story, mixed-use buildings

• Olympic District – Larger format commercial uses with taller office buildings

• North California corridor – mixed-use buildings with ground-floor retail and upper floor apartments/condos

The WDSP, the related draft General Plan and Zoning Ordinance amendments, and draft EIR will be released for public review in October; they will be reviewed during a series of at least seven public meetings at the City Council, Planning Commission, Design Review Commission, and Transportation Commission beginning in January. Final adoption of the WDSP is expected to occur in the spring of 2015.

For contact or other information, visit http://www.walnut-creek.org/citygov/depts/cd/planning/west_downtown_specific_plan.asp.