Fitness Center, pool, parking lot, dog park at Del Valle, Hillside have closures
In print on page 2A
The Del Valle pool will be closed Monday, June 23, through Sunday, June 29, due to the much-needed replacement of the sand filters. The pool will reopen on Monday, June 30.
Also at Del Valle, the clubhouse, Fitness Center and dog park will be closed on Monday, June 23, and Tuesday, June 24. During these days, weather permitting, the entire Del Valle parking lot will be seal coated and restriped.
Repairs will also be made inside the women’s locker room and several other issues will be addressed during the closure of the clubhouse and Fitness Center.
The Hillside pool parking lot will be closed on Monday, June 23, and Tuesday, June 24, weather permitting, for seal coating and restriping. The pool remains open and so will Hillside’s main parking lot.
In short: • Del Valle Pool: closed Monday, June 23, through Sunday, June 29
• Del Valle Clubhouse and Fitness Center: closed Monday, June 23, and Tuesday, June 24
• Dog park: closed Monday, June 23, and Tuesday, June 24
• Hillside pool parking lot: closed Monday, June 23, and Tuesday, June 24 (pool remains open)